The owner hires an architect. |
|
The architect identifies owner requirements. |
|
The architect produces the drawings. |
|
The architect's firm puts the job out for bid. |
|
Design changes are suggested to bring the building
to within budget. |
|
The architect re-designs the building to accommodate
these modifications. |
|
The contractor builds the building using low bidders. |
|
The low bidders fight for every change order and refuse
to work overtime “because it’s not in the
bid.” |
|
Architect and contractor haggle over value-engineered
issues and change orders, which the owner |
|
The building is completed. |